Your TMS Information Source Since 2012

Have a TMS tip? Share it here and keep up with latest on our Facebook Page or Twitter!

January

Friday Report - January 16, 2015

Posted by bernell on January 17, 2015

TMS PRE-PRODUCTION UPDATE 1-16-2015

(Note:  For the most up-to-date information on producing wells in Lousiana, please go here:

https://tmsinsder.com/index.php/tms-news/2014-news/december/louisiana-wells/

 

AND, for the most up-to-date information on producing wells in Mississippi, please go here:

http://www.ogb.state.ms.us/TMSDevelopment.php)

Wilkinson County:

Halcon Creek Cottage West 1H, H&P Flex 3 Rig #249 completed drilling. Creek Cottage is located on Whitestown Road a couple of miles south of Hwy 24. Ready to Fracture.

Halcon Rogers 1H, accessed from Hwy 24 west of Centreville about 5 miles.  Drilling operations are complete. Awaiting fracturing.

Goodrich CMR-Foster Creek 8H-1 and 2, accessed from Hwy 563 to Macedonia Road then to Helmer Road. Nabors Rig #624 spud -1 on 9-15 and spud -2 on 9-21. Both drills are finished.  Drilling completed and awaiting fracturing on both wells.

Comstock CMR Foster Creek 28-40 No. 1H, located on Will Floyd Road. Access appears to be south off of Hwy 563 on to Macedonia Road, then on to Netterville Road, then on to Will Floyd Road. Eighteen stages fracked.  Likely flowing back…no report.

Sanchez Morris 2H, RAPAD Rig #31 spud October 13.  +Accessed from the Pickneyville Road...Traveling west out of Woodville, turn north (right) just past the Old River water tank on to an otherwise private road. Drilling completed with a 6,450 foot lateral. No recent info…Fracturing operations likely soon.

Sanchez Macedonia –Tentative plans called for 3 wells to be drilled here. Located on Macedonia Road, north of Centreville, this site is accessed off of Hwy 563, then down Macedonia Road about 10 miles to site on west side of Macedonia Road. A new rig is expected to be used for this first 3-well drill in the play. Pending permits for alternative risk charges suggests no imminent start to drilling.
  
Amite County:

Encana Ash 13H-1 and 13H-2, Located on the east side of Ash Road, accessed via Lower Centreville Road about 3 miles southeast of Centreville. Trinidad Rig #124 spud July 21.  No confirmation, but this well should be flowing back.

Goodrich T. Lewis 7-38H-1 located from the same access road as the EnCana Lewis 7-18H-1 off of County Farm Road a mile or so north of the Lower Centreville Road, accessed off of the Greensburg Road, located about 6 miles south of Liberty.  Ensign Rig #753 reportedly spud on November 14. Drilling completed at 18,540' after a 35 day drill. Awaiting fracking.

 
Encana Mathis 29-17H-1, located on the same pad as Mathis 29-32H-1 off of Bean Road west of Gillsburg in south Amite County.  Trinidad Rig #124 spud October 17. Completed a 9,169 foot lateral to a total depth of 21,730 foot. Fracturing operations should be completed shortly.

Encana Longleaf 29H-1 and -2, located off Tobias Lane off of Hwy 584 roughly 3 miles southeast of Liberty. Awaiting fracturing, likely after the Mathis.

EnCana Lawson 25-13H-1, located on the same pad as the Lawson 25H-1 in Downtown Gillsburg, MS in Southeast Amite County. Trinidad Rig #124 spud on December 9. Drilling completed at 22,075 foot.  Lateral length is estimated at over 10,000 foot.

EnCana McIntosh 15H/Reese 16H.  Site located on Chance Road off of Ewell Road south of Hwy 48 a few miles east of Centreville, this double unit pad was set to have 4 wells drilled, but it appears only 2 will be drilled at this time. Encana Reese 16H-1 was reported as spud 12/9/2014 and has set intermediate casing.  As best I can tell, Reese 16H-1. McIntosh 15H-1 was reported as spud 12/11/2014 and has set intermediate casing. Laterals being drilled now.

Pike County: A permit has been approved for 1 Sanchez unit in Pike County.  Several unit applications by VirTex, Sanchez and Encana are pending.

St. Helena Parish:

Comstock Meeks 56 HZ-1, located on Martin Lane north of Hwy 38 off of Hwy 441, just south of the Mississippi line and Encana Lawson 25H-1. Pad is finished.  Plans to drill appear to be on hold.

St. Tammany: Experimental preliminary vertical well by Helis Oil and Gas, the EADS POITEVENT ETAL #1, has been permitted.

Tangipahoa:

Goodrich Williams 46H-1 has the Ensign Rig #753 spud 9/11. Completed total drilling depth of 18,650 foot.  Reportedly fractured 20 stages successfully.  Should be flowing back.

Halcon Franklin PST Prop H-1, H&P rig # 623 spud November 1. Access to this site is from downtown Osyka, Mississippi on South Railroad. Drilling complete, production casing in place to 17,957 foot.  Awaiting fracturing.

Goodrich Kent 41H-1, Nabors X-17, located on Monroe Stevens Road, accessed via Hwy 440/1057 to Hwy 1058 to B Brown Road, then to Monroe Stevens Road. Spud November 5.  Drill completed with a 6,000 foot lateral.  Fracturing operations complete, plugs drilled out and flaring…early on in the flowback phase.

Goodrich Kinchen 58H-1, accessed from Hwy 1053 about 1 mile north of Kentwood off of Hwy 51. H&P Flex Rig 3 # 249 spud on December 6. Completed drilling to a depth of 18,365 foot. Awaiting fracturing.

Goodrich B Nez 43H -1 and -2, are located in two different units, Little Silver Creek Field, Sand Unit D is the unit for the B-Nez 43H-1 well and Little Silver Creek, Sand Unit N is the unit where the B-Nez 43H-2 will be drilled.  The drilling site is located on the south side of Hwy 38 east of Kentwood about 8 miles and nearly to the Washington Parish line.  The nose of the 43H-1 unit tilts northeasterly into Washington Parish.  Nabors X-17 spud 43H-1 on 12/17.  As of January 5, 2015 intermediate casing is set at 11,325 foot.  Drilling suspended until 43H-2 drill is completed.

43H-2 spud 1/3/2015. Set surface casing at 3,625 foot and drilling away at 3,780 foot as of January 12.

Washington Parish:

Goodrich Painter Etal 5H-1: Nabors Rig #624 spud January 11. Pad located on the east side of Louisiana Highway 450 about 4 miles south of Louisiana Hwy 38. Drilling at 1,178 foot on January 12.

East Feliciana: Permits in process…

West Feliciana:

Halcon Walker- permitted…no drilling plans at this time.



What do you think about it?